top of page
Arrowtown Fuel Depot

Arrowtown Fuel Depot

Client: Mansfield Installations Ltd

Excavation of 1,100 m3 of site material to a depth of 4.0 m to allow the installation of two large in ground fuel tanks andon-site stormwater pads. Base installed the reticulated pipeworks and services with Mansfield Installations and backfilled /fabric wrapped with approx. 750 m3 of drainage gravel.

• Fuel Tank           • Stormwater          • Reticulated Pipework

Millbrook Stage 3C

Millbrook Stage 3C

Client: Signal Group

1.5 km of stormwater, wastewater, water & 3 km of power, telecommunications, gas, reticulated services and 18 manholes for a 15 lot subdivision at Millbrook West. Deep blasted rock (500 m3) for the services and winter conditions made the project challenging and health & safety focused. All backfilling was fully engineered and certified.

• Stormwater          • Wastewater          • Telecommunications           • Gas

bottom of page